Back to results
Web · Speed to Market
B2B SaaS · Series B

A production marketing site, live in 9 days.

A scaling B2B software company needed to retire a slow, fragmented WordPress build before a major product launch. We compressed the typical 10–14 week web project into a single two-sprint delivery - without cutting scope on performance, SEO or analytics.

9 days
Kickoff → production
+62%
Lift in demo requests vs. legacy site
94
Lighthouse performance (mobile)
0
Post-launch P1 incidents

The brief

Replace a 40-page legacy site with a fast, modular marketing platform that the in-house content team could own - before a product launch locked in two weeks out.

How we worked

Parallel tracks: design system, page templates, CMS schema and analytics wiring all moving in lockstep. Daily 30-minute syncs, async approvals, no waterfall handoffs.

The bar

Core Web Vitals in the green on mobile, AA accessibility, full schema markup, and a CMS the marketing team could ship from on day one.

What we shipped

The outcome

The site shipped on day 9, ahead of the product launch. Within the first 30 days, demo requests lifted 62% against the prior 30-day baseline, mobile bounce dropped 28%, and the marketing team published 14 new pages without a single engineering ticket.